Park Lane

Q Scaffolding was rewarded the contract to erect the external scaffold along with edge protection and Haki staircase to provide access for refurbishment of window frames, roofing works and brick work cleaning.
Due to the location of the project, which has main stream traffic and constant pedestrians, the gantry was erected during the night time. The first elevation was double boarded with 2mm polyethylene membrane to protect debris from falling on the pavement.
Our stalwart team of operatives erected the structure within the time frame required by our client.